Roads

  • Footpath replacement, Stage 1 Simmons Park to ANZAC Park.
  • Pothole repairs in Lindisfarne, Geilston Bay and Risdon Vale.
  • Construction of walkways within the Clarendon Vale Green Belt.
  • Gravel road grading as required based on inspections.
  • Guide post replacement continues at various locations.
  • Ongoing footpath replacement program.
  • Reseal preparation at various sites.
  • Commencement of annual verge maintenance program and Tangara Trail vegetation.

Drainage

  • Ongoing cleaning of open drains.
  • Minor drainage works as required.

Parks and reserves

  • South Street Dog Exercise Area renovation.
  • Elevated platform tree work.
  • Ongoing park maintenance as per established maintenance schedules.
  • Spring renovations on all ovals.

Fire Management

  • Maintenance of walking tracks in natural areas and Tangara Trail.
  • Maintenance and management of natural areas as per the various natural area management plans.
  • Continuation of Councils property management strategy.
  • Commencement of Council’s annual firebreak management program.