Roads
- Footpath replacement, Stage 1 Simmons Park to ANZAC Park.
- Pothole repairs in Lindisfarne, Geilston Bay and Risdon Vale.
- Construction of walkways within the Clarendon Vale Green Belt.
- Gravel road grading as required based on inspections.
- Guide post replacement continues at various locations.
- Ongoing footpath replacement program.
- Reseal preparation at various sites.
- Commencement of annual verge maintenance program and Tangara Trail vegetation.
Drainage
- Ongoing cleaning of open drains.
- Minor drainage works as required.
Parks and reserves
- South Street Dog Exercise Area renovation.
- Elevated platform tree work.
- Ongoing park maintenance as per established maintenance schedules.
- Spring renovations on all ovals.
Fire Management
- Maintenance of walking tracks in natural areas and Tangara Trail.
- Maintenance and management of natural areas as per the various natural area management plans.
- Continuation of Councils property management strategy.
- Commencement of Council’s annual firebreak management program.