Roads

  • Pothole repairs in Rose Bay, Lindisfarne and Geilston Bay.
  • Gravel road grading as required based on inspections.
  • Guide post replacement continues at various locations.
  • Ongoing footpath replacement program.
  • Construction of walkways within the Clarendon Vale Green Belt.
  • Reseal preparation at various sites.

Drainage

  • Ongoing cleaning of open drains.
  • Minor drainage works as required.
  • Bastick Street, Rosny stormwater and carpark upgrade.
  • Houston Drive, Cambridge stormwater upgrade.

 

Parks and reserves

  • Elevated platform tree work.
  • Ongoing park maintenance as per established maintenance schedules.
  • South Street Dog Exercise Area renovation.
  • Spring renovations on all ovals.

 

Fire Management

  • Maintenance of walking tracks in natural areas and Tangara Trail.
  • Maintenance and management of natural areas as per the various natural area management plans.
  • Continuation of Councils property management strategy.
  • Entrance point signage installation for the Tangara Trail.